Kitchen Renovation Timeline Cyprus: Week-by-Week Schedule
Quick Answer: How long does a kitchen renovation actually take in Cyprus? A realistic week-by-week timeline from first KITWOOD consultation to final inspection — including the hidden lead times nobody warns you about.
Phase 1: Design & Specification
Consultation, measurement, 3D design, product selection, quotation, and approval follow a project-specific programme. Exact appliance models should be confirmed before cabinetry production.
Phase 2: Cabinetry Production
KITWOOD coordinates production through its exclusive advanced manufacturing supplier. Selected materials, finishes, hardware, availability, and timing are confirmed for the project.
Phase 3: Site Installation
Removal, preparation, delivery, installation, adjustment, accessories, and service connections follow the agreed scope, site conditions, and written schedule.
Phase 4: Worktop & Handover
Where post-installation worktop templating is required, fabrication and fitting are scheduled when the relevant cabinetry is ready. Agreed adjustments, care and warranty documents, and handover follow.